NEW LEBANON CENTRAL SCHOOL DISTRICT
New Lebanon, NY
There was a multitude of various construction activities performed at W.B.H Elementary School and the JR/SR High School in New Lebanon. A new Pre-Engineered Metal Building was constructed at the High School for maintenance equipment and field storage. This work also involved the reconstruction of a new student parking lot. New paving was installed around the building with ADA access to the sports fields. Within the building, the locker rooms were completely renovated, all exterior doors were replaced and new VCT flooring was installed in the corridors. At W.B.H., the existing gymnasium was demolished and reconstructed, doubling the size. The kitchen was completely renovated including all new utilities, ventilation, and equipment. A new, secured vestibule was added to the Main Entrance as well as a complete renovation of the Main Office spaces. A total of 16 toilet rooms were renovated between the two buildings. Both Schools received new fire alarm systems, draft sealing, and lighting upgrades as well.
Project Cost: Approx. $11.8M